Date: 09/07/2009 (report for the period from 1º to 30/06/2009)Location: Bigelow Aerospace Advanced Space Studies (BAASS), Las Vegas, Nevada, USA
Las Vegas, 2009: BAASS June report shows the DIA program buying MUFON cases and going to Brazil
The June 2009 monthly report of BAASS, the DIA contractor in the AAWSAP program, describes the hiring of staff, plans for an underground vault for “exotic” material, the progress of the EarthTech technical studies and the dispute over the money passed on to MUFON. It also gathers MUFON field investigation reports, the mission of investigators to Brazil and the research on incidents at missile bases in the 1960s and 1970s.
- Event date
- 09/07/2009 (report for the period from 1º to 30/06/2009)
- Location
- Bigelow Aerospace Advanced Space Studies (BAASS), Las Vegas, Nevada, USA
- Topic
- AAWSAP and advanced technologies
- Source agencies
- DOW
- Documents
- 1 document · 134 pages
- Reading time
- 25 min
Report coverPhysical page 1DOCUMENTARY SOURCES · DOW
What the records tell
This dossier deals with an administrative report, not a sighting. Bigelow Aerospace Advanced Space Studies (BAASS), a Las Vegas company contracted in 2008 by the Defense Intelligence Agency (DIA) for the AAWSAP program, delivered monthly progress reports. The June 2009 one has 134 pages, a cover dated July 9, 2009 and covers the period from June 1 to 30. The title page bears a confidentiality notice, struck through in the released version. The names of employees and collaborators were replaced by codes such as “AAP Person 4”, and data on private individuals appear redacted with the notation 1843(a)(2) or 1843(a)(3).
The first part deals with the company's structure. In June, according to the report, BAASS received 461 résumés, conducted 36 to 48 interviews and reached 45 full-time and 6 part-time employees, including investigators with law enforcement and AFOSI backgrounds, engineers, scientists, mission analysts and security guards, including at the ranch in Utah. The administrator designed an underground vault of about 465 m² in North Las Vegas, with 90 cm walls and a steel door, to store “exotic material or tissue” that the organization might obtain, including in Brazil, and bought five buildings for a laboratory, an evidence warehouse and a secure room (SCIF).
Another section follows the contract with EarthTech International, signed on December 31, 2008, to deliver 24 to 30 studies on the physics of advanced aerospace vehicles, in the same twelve technical areas as the contract with the DIA. The table lists collaborators from universities and companies and topics such as antigravity, warp drives, vacuum energy, wormholes, metamaterials, metallic glasses, the statistical Drake equation, brain-machine interfaces and nuclear propulsion. These studies correspond to the Defense Intelligence Reference Documents (DIRDs), several of them already covered in their own dossiers. By the end of June, EarthTech had received about 24 papers.
The month's point of friction was MUFON. In February 2009 BAASS bought from the civilian group the right to be notified within a few hours of significant reports, to receive the investigation reports and to collect physical evidence for analysis. In a letter of June 25, reproduced in the report, the BAASS administrator records that MUFON spent US$ 11.014,37 of US$ 74.666,67 in February and March, US$ 23.803,95 of US$ 56.000 in April and US$ 23.812,00 of US$ 51.000 in May, and proposes lowering the payment to US$ 25.500 per month until October. In its reply of June 29, MUFON accepts the reduction and asks for a new review.
Pages 17 to 100 contain the field investigation reports of the MUFON STAR teams deployed in May and June 2009. They are accounts from private individuals, collected by civilian investigators and passed on to BAASS: lights and objects seen in Scammon (Kansas), Dardanelle (Arkansas), near Marathon (Texas), Buffalo (Oklahoma), Trego and Poynette (Wisconsin), Fallon (Nevada), Pasadena (Maryland), Grants Pass (Oregon) and in the Phoenix area (Arizona), among others. The conclusions about the credibility of the witnesses and the nature of the objects are those of the MUFON investigators. Each case with a date and location has its own dossier on the portal.
The mission to Brazil, from May 25 to June 3, 2009, took one team to São Paulo and Brasília for contacts and another to Fortaleza, Sobral and Cachoeira, in Ceará, to investigate recent reports in the Itatira region. According to the report, the investigators were instructed to keep a low profile and avoid the press. The northern team copied files from a local research group, with Ceará cases from 1962 to 2009 and more than 65 GB of videos, and listed the military documents on Colares and Operation Prato as the top translation priority. The report recommends monitoring the Colares region.
Project Northern Tier, described as one of the sponsor's main priorities, brought together research on incidents at Air Force bases with missiles and bombers: Minot (North Dakota), Malmstrom (Montana), Loring (Maine) and Wurtsmith (Michigan), with episodes from 1967 to 1975. The team searched for military witnesses in commercial databases; at Loring alone, 1.428 names became 588 people of compatible age, with two confirmed contacts. The report closes with the study of the files released by the United Kingdom, Canada, Denmark and France (GEIPAN) and with the claim, attributed to BAASS itself, that its case database was already the largest in North America.
The second half of the June 2009 report shows the program's field work. Five reports from MUFON, the network of volunteer investigators contracted by BAASS, deal with cases from April and June 2009: amber lights and a triangle of lights in Arizona on the night of April 28, orbs and a humanoid figure in Grants Pass, Oregon, and three aligned lights over a house in Poynette, Wisconsin. Each includes interviews, rangefinder measurements and weather charts. The BAASS team also traveled to Ceará, from May 25 to June 3, and returned with more than 70 GB of files from Brazilian ufologists.
The report also describes Project Northern Tier, created in April 2009 to track down witnesses of incidents from 1966 to 1975 at the Minot, Wurtsmith, Loring and Malmstrom bases, and the study of the UAP files released by the United Kingdom, Canada, Denmark and the French GEIPAN. In the conclusion, BAASS states that it has initiated contact with the Uruguayan Air Force (CRIDOVNI), says that MUFON had been passing on far fewer cases than expected and assesses that its database was already larger than that of any UAP organization in North America. These assessments are the company's own.
More images from the document

DIRECT READING OF THE FILE
The document, in the original
Pages 1 to 67 translated in full, one per block, in the page files; pages 68 to 134 are translated in their own blocks. Accounts written by private individuals and reproduced in the report appear as complete summaries. For privacy, health data of those involved, ethnic origin and e-mail addresses were left out of the English; names, addresses, phone numbers and coordinates of private individuals were already redacted in the release and appear as [redacted] or asterisks. Images suppressed in the release are indicated on the pages.
EXCERPT 1 · PHYSICAL PAGE 1
Physical page 1, full page
111/EIIIW111111,II/I
111,11c1111,1c1ITll/111 ®
ly 9, 2009
~Editorial note: Cover of the BAASS monthly report for June 2009, dated July 9, 2009.
Check the original PDF
111/EIIIW111111,II/I
111,11c1111,1c1ITll/111 ®
ly 9, 2009
~View the document record ↗ · Physical page 1, counting the cover.
EXCERPT 2 · PHYSICAL PAGE 10
Physical page 10, full page
Contributor
Organization
Topic
Due Date
IAAP Person 58
EarthTech lntem'I
Antigravity Studies
5/1/2009
IAAP Person 75
!Consulting
SC-mediated gravity experimentation
5/1/2009
IAAP Person 69
Positronics Research
Matter-antimatterenergy source
5/15/2009
IAAP Person 7 4
Icons.
Warp drives
5/15/2009
IAAP Person 73
Wayne State Univ.
Brain-machine interfaces
5/15/2009
I
IAAP Person 65
Univ. of Arizona
Novel MEMS-based biosensors
5/1/2009
I
IAAP Person 70
Univ. of Illinois
IEC fusion as acompact energy source
6/15/2009
I
IAAP Person 58
EarthTech lntem'I
Vacuum energy applications
5/1/2009
I
IAAP Person 57
EarthTech lntem'I
Spacetime modification
5/30/2009
II
IAAP Person 58
EarthTech lntem'I
Wormholes in spacetlme
5/1/2009
IAAP Person 66
Ohio State Univ.
Advanced metallic alloys
5/30/2009
IAAP Person 63
Johns Hopkins Univ.
Metallic glass materials
6/10/2009
IAAP Person 90
Programmable Matter Corp.
Programmable matter
6/10/2009
I
IAAP Person 65
Univ. of Arizona
Novel biomaterials
5/1/2009
I
IAAP Person 71
Univ. of Texas/Austin
Metallic spintronics
6/10/2009
I
9Editorial note: Table of contributors to the EarthTech studies: organization, topic and delivery deadline (first part).
Check the original PDF
Contributor
Organization
Topic
Due Date
IAAP Person 58
EarthTech lntem'I
Antigravity Studies
5/1/2009
IAAP Person 75
!Consulting
SC-mediated gravity experimentation
5/1/2009
IAAP Person 69
Positronics Research
Matter-antimatterenergy source
5/15/2009
IAAP Person 7 4
Icons.
Warp drives
5/15/2009
IAAP Person 73
Wayne State Univ.
Brain-machine interfaces
5/15/2009
I
IAAP Person 65
Univ. of Arizona
Novel MEMS-based biosensors
5/1/2009
I
IAAP Person 70
Univ. of Illinois
IEC fusion as acompact energy source
6/15/2009
I
IAAP Person 58
EarthTech lntem'I
Vacuum energy applications
5/1/2009
I
IAAP Person 57
EarthTech lntem'I
Spacetime modification
5/30/2009
II
IAAP Person 58
EarthTech lntem'I
Wormholes in spacetlme
5/1/2009
IAAP Person 66
Ohio State Univ.
Advanced metallic alloys
5/30/2009
IAAP Person 63
Johns Hopkins Univ.
Metallic glass materials
6/10/2009
IAAP Person 90
Programmable Matter Corp.
Programmable matter
6/10/2009
I
IAAP Person 65
Univ. of Arizona
Novel biomaterials
5/1/2009
I
IAAP Person 71
Univ. of Texas/Austin
Metallic spintronics
6/10/2009
I
9View the document record ↗ · Physical page 10, counting the cover.
EXCERPT 3 · PHYSICAL PAGE 11
Physical page 11, full page
IAAP Person 78
Univ.of Texas/ Austin
Metamaterials/signature reduction
6/10/2009
I
IAAP Person 80
lntem'I Acad. Astronautics
Statistical Drake equation
5/1/2009
I
IAAP Person 81
Wayne State Univ.
Field effects/biologica Itissues
5/15/2009
I
IAAP Person 79
DoD consultant
Laser weapons
5/31/2009
I
IAAP Person 64
Northrop Grumman (ret.)
Pulse-power-based weaponry
5/1/2009
I
IAAP Person 77
GravWave, LLC
Gravity wave communication
5/1/2009
I
IAAP Person 76
Univ. of Washington
FTL/quant entanglement communicatlo 5/31/2009
I
I
IAAP Person 72
University of Nevada Reno
Advanced Nuclear Space Propulsion
6/30/2009
IAAP Person 75
IConsulting
Maverick vs. corporate inventor culture
5/1/2009
10Editorial note: Table of contributors to the EarthTech studies: organization, topic and delivery deadline (second part).
Check the original PDF
IAAP Person 78
Univ.of Texas/ Austin
Metamaterials/signature reduction
6/10/2009
I
IAAP Person 80
lntem'I Acad. Astronautics
Statistical Drake equation
5/1/2009
I
IAAP Person 81
Wayne State Univ.
Field effects/biologica Itissues
5/15/2009
I
IAAP Person 79
DoD consultant
Laser weapons
5/31/2009
I
IAAP Person 64
Northrop Grumman (ret.)
Pulse-power-based weaponry
5/1/2009
I
IAAP Person 77
GravWave, LLC
Gravity wave communication
5/1/2009
I
IAAP Person 76
Univ. of Washington
FTL/quant entanglement communicatlo 5/31/2009
I
I
IAAP Person 72
University of Nevada Reno
Advanced Nuclear Space Propulsion
6/30/2009
IAAP Person 75
IConsulting
Maverick vs. corporate inventor culture
5/1/2009
10View the document record ↗ · Physical page 11, counting the cover.
EXCERPT 4 · PHYSICAL PAGE 12
Physical page 12, full page
BAASS has Contracted to Purchase
Information on UAPs from MUFON
In February 2009, BAASS executed a Purchase order with MUFON that
entitles BAASS to: (a) receive notification of significant reports on UAP sightings
from anywhere in the United States within hours, (b) receive timely reports from
MUFON investigators regarding investigations of these incidents (c) receive
physical evidence (including photographs, digital recordings, samples of soil,
insects, plants, and animals) for scientific analysis. BAASS has multiple
laboratories that are ready to conduct forensic, photographic, metallurgic,
chemical, isotope, biological, chemical analysis of any specimens that BAASS
receives from MUFON.
BAASS has already hired a team of high quality top investigators with
extensive intelligence and law enforcement investigative experience. These
investigators are currently located in Las Vegas and are trained to deploy as
"special forces" rapid reaction investigative teams that are deployable anywhere
in the United States if BAAS$ determines that high value UAP cases warrant
additional investigations. However this investigative group is still too small to
cover the geographic area needed in both the United States and overseas.
Throughout the months of March through June, it became apparent that
the number of cases that MUFON was providing BAASS was significantly lower
than first agreed at the beginning of the purchase agreement contract. At the
same time, it became apparent that MUFON was only spending about 50% of
h ir II tted stipend per month. Accordingly, at the end of June 2009IAAP
I
AAP
1Persoo 4 .
Person 4 proposed to reduce MUFON's monthly stipend by 50% while encouraging
t e organization to begin to use the money that remained unspent to make up
the difference. BAAS$ proposed, as per the purchase agreement, that there would
be a further review of MUFON's performance by the end of October 2009.
AAP Person 105
penned the following reply addressed
to AAP Person 4
on June 29, 2009. The following is the text of the letter from
MUFON to BAASS
11Editorial note: Section on the contract for the purchase of UAP information signed between BAASS and MUFON in February 2009 and the proposal to cut the monthly payment in half.
Check the original PDF
BAASS has Contracted to Purchase
Information on UAPs from MUFON
In February 2009, BAASS executed a Purchase order with MUFON that
entitles BAASS to: (a) receive notification of significant reports on UAP sightings
from anywhere in the United States within hours, (b) receive timely reports from
MUFON investigators regarding investigations of these incidents (c) receive
physical evidence (including photographs, digital recordings, samples of soil,
insects, plants, and animals) for scientific analysis. BAASS has multiple
laboratories that are ready to conduct forensic, photographic, metallurgic,
chemical, isotope, biological, chemical analysis of any specimens that BAASS
receives from MUFON.
BAASS has already hired a team of high quality top investigators with
extensive intelligence and law enforcement investigative experience. These
investigators are currently located in Las Vegas and are trained to deploy as
"special forces" rapid reaction investigative teams that are deployable anywhere
in the United States if BAAS$ determines that high value UAP cases warrant
additional investigations. However this investigative group is still too small to
cover the geographic area needed in both the United States and overseas.
Throughout the months of March through June, it became apparent that
the number of cases that MUFON was providing BAASS was significantly lower
than first agreed at the beginning of the purchase agreement contract. At the
same time, it became apparent that MUFON was only spending about 50% of
h ir II tted stipend per month. Accordingly, at the end of June 2009IAAP
I
AAP
1Persoo 4 .
Person 4 proposed to reduce MUFON's monthly stipend by 50% while encouraging
t e organization to begin to use the money that remained unspent to make up
the difference. BAAS$ proposed, as per the purchase agreement, that there would
be a further review of MUFON's performance by the end of October 2009.
AAP Person 105
penned the following reply addressed
to AAP Person 4
on June 29, 2009. The following is the text of the letter from
MUFON to BAASS
11View the document record ↗ · Physical page 12, counting the cover.
EXCERPT 5 · PHYSICAL PAGE 13
Physical page 13, full page
MIJF©N
~
-•UFONo-
Mutual UFO Network, Inc.
I'843( a)(2)
June 29, 2009
BAASS
IAAP Person 4
Dea~AAP Person 4
We are in receipt of your letter dated June 25, 2009 regarding the Purchase
Agreement Contract and suggested changes.
Let me begin by saying that we at MUFON are very pleased with the positive
changes we have been able to implement as a result of our agreement. More
importantly because of the dedication of our two organizations we now, for the
first time, have a defined and repeatable process for quickly analyzing new cases,
triaging them to determine their level of importance, and quickly responding to
key cases within hours of being neported. This is a HUGE step forward for Ufology
12Editorial note: Letter from MUFON to BAASS, dated June 29, 2009, in response to the proposed change to the purchase contract (beginning).
Check the original PDF
MIJF©N
~
-•UFONo-
Mutual UFO Network, Inc.
I'843( a)(2)
June 29, 2009
BAASS
IAAP Person 4
Dea~AAP Person 4
We are in receipt of your letter dated June 25, 2009 regarding the Purchase
Agreement Contract and suggested changes.
Let me begin by saying that we at MUFON are very pleased with the positive
changes we have been able to implement as a result of our agreement. More
importantly because of the dedication of our two organizations we now, for the
first time, have a defined and repeatable process for quickly analyzing new cases,
triaging them to determine their level of importance, and quickly responding to
key cases within hours of being neported. This is a HUGE step forward for Ufology
12View the document record ↗ · Physical page 13, counting the cover.
EXCERPT 6 · PHYSICAL PAGE 14
Physical page 14, full page
and would not have happened without BAASS and MUFON working together
towards a common goal of rapid response.
In regards to your suggestion to move funding to a mid-term level, we certainly
understand your rationale for wanting to do so. Please understand that as we
aggressively pursue other avenues of finding, and attracting, new cases that our
support and deployment costs will rise accordingly. Four months is a very short
timeframe to measure incident and expense results considering we were at
ground zero just four months ago.
MUFON accepts the reduction in payments for the next four months with
supplemental monies to come from the initial funds allocated from February to
June 2009. We hope that BAASS can reevaluate our monthly allocation in October
2009 based on the expected increase in expenses not only resulting from recent
changes to deployment criteria but also to increased MUFON public exposure.
Again, we are pleased to be providing services to BAASS and working together to
solve the UFO mystery. Our goal at MUFON is to make this a mutually beneficial
relationship for many years to come.
Sincerely,
AAP Person 105
13Editorial note: End of the MUFON letter of June 29, 2009: MUFON accepts the reduction in payments for four months and asks for a new evaluation in October.
Check the original PDF
and would not have happened without BAASS and MUFON working together
towards a common goal of rapid response.
In regards to your suggestion to move funding to a mid-term level, we certainly
understand your rationale for wanting to do so. Please understand that as we
aggressively pursue other avenues of finding, and attracting, new cases that our
support and deployment costs will rise accordingly. Four months is a very short
timeframe to measure incident and expense results considering we were at
ground zero just four months ago.
MUFON accepts the reduction in payments for the next four months with
supplemental monies to come from the initial funds allocated from February to
June 2009. We hope that BAASS can reevaluate our monthly allocation in October
2009 based on the expected increase in expenses not only resulting from recent
changes to deployment criteria but also to increased MUFON public exposure.
Again, we are pleased to be providing services to BAASS and working together to
solve the UFO mystery. Our goal at MUFON is to make this a mutually beneficial
relationship for many years to come.
Sincerely,
AAP Person 105
13View the document record ↗ · Physical page 14, counting the cover.
EXCERPT 7 · PHYSICAL PAGE 15
Physical page 15, full page
lllllllrIIIIINII
11,111EIINIIITIIIEI•
June 25, 2009
AAP Person
Dear 105
This letter is to address the status of the MUFON Purchase Agreement contract that was
executed between BAASS and MUFON in February 2009.
Firstly, we are pleased to see that MUFON is moving ahead with plans to execute contracts
with TV and other media as a means of raising Its national profile.
With regard to BAASS's viewpoint on MUFON's performance to date, Section 7.0 of the
purchase agreement defines three alternative scenarios based on this June performance
review:
1.1
Immediate termination effective June 30, 2009, of the contract for Seller's failure to provide the
quality and quantity of information to the satisfaction of Buyer.
1.2
Continuation ofthe Agreement under the same terms and conditions as agreed.
1.3
Continuation ofthe Agreement with a merit-based increase in price for the Product.
There are two aspects that have emerged from MUFON's monthly reports that have caused
BAASS significant concern. They are:
(1) We note that for the month of February/March, MUFON spent $11,014.37 out of
$74,666.67 allocated; in April, MUFON spent $23,803.95 out of $56,000 allocated; and in
May, MUFON spent $23,812.00 out of $51,000 allocated. Therefore, it appears that
BAASS is sending excessive sums to MUFON on a monthly basis.
(2) We feel that MUFON's productivity does not match the monthly contract award. As of
mid-to late June, BAASS has not received adequate number of cases to justify spending
$51,000 per month, nor has MUFON ramped up its hiring rate to accommodate the
monthly $51,000 stipend as evidenced by the fact that the monthly expenditures by
11843(a)(2)Editorial note: Letter from BAASS to MUFON, dated June 25, 2009, which evaluates MUFON's performance and points to spending far below the amounts transferred (beginning).
Check the original PDF
lllllllrIIIIINII
11,111EIINIIITIIIEI•
June 25, 2009
AAP Person
Dear 105
This letter is to address the status of the MUFON Purchase Agreement contract that was
executed between BAASS and MUFON in February 2009.
Firstly, we are pleased to see that MUFON is moving ahead with plans to execute contracts
with TV and other media as a means of raising Its national profile.
With regard to BAASS's viewpoint on MUFON's performance to date, Section 7.0 of the
purchase agreement defines three alternative scenarios based on this June performance
review:
1.1
Immediate termination effective June 30, 2009, of the contract for Seller's failure to provide the
quality and quantity of information to the satisfaction of Buyer.
1.2
Continuation ofthe Agreement under the same terms and conditions as agreed.
1.3
Continuation ofthe Agreement with a merit-based increase in price for the Product.
There are two aspects that have emerged from MUFON's monthly reports that have caused
BAASS significant concern. They are:
(1) We note that for the month of February/March, MUFON spent $11,014.37 out of
$74,666.67 allocated; in April, MUFON spent $23,803.95 out of $56,000 allocated; and in
May, MUFON spent $23,812.00 out of $51,000 allocated. Therefore, it appears that
BAASS is sending excessive sums to MUFON on a monthly basis.
(2) We feel that MUFON's productivity does not match the monthly contract award. As of
mid-to late June, BAASS has not received adequate number of cases to justify spending
$51,000 per month, nor has MUFON ramped up its hiring rate to accommodate the
monthly $51,000 stipend as evidenced by the fact that the monthly expenditures by
11843(a)(2)View the document record ↗ · Physical page 15, counting the cover.
EXCERPT 8 · PHYSICAL PAGE 16
Physical page 16, full page
MUFON from April and May 2009 have reached a plateau at $23,803.95 and $23,812.00
respectively.
For these reasons, we propose a Phase II funding level between July 1 and October 31, 2009
of $25,500 per month. This sum, when added to the unspent MU FON allocations
(estimated at approximately $120,000 for February/March, April and May 2009} should be
more than sufficient to almost double MUFON's present horsepower.
Regardless of the above, we believe that the accumulation of large sums of unspent money
was not in the spirit of the BAASS-MUFON purchase agreement.
It may be argued that MUFON has taken some time to ramp up to the present levels and
hence could not spend the allocated money. In response we propose that from July 1
October 31, if MU FON combines the monthly stipend ($25,500) with a monthly portion of
the unspent BAASS money, then a net monthly sum of approximately $55,000 is available
for MUFON's operations. We believe that this mechanism will be adequate for MUFON to
expand to a higher level of performance between July 1 and October 31, 2009.
By October 27, 2009, we will have another opportunity to examine the monthly contract
award In light of MUFON's progress in expanding its organizational productivity.
Sincerely
AAP Person 4
Administrator, BAASS
11843(a)(2)Editorial note: End of the BAASS letter of June 25, 2009: proposal of a payment of US$ 25.500 per month from July to October and a new evaluation by October 27, 2009.
Check the original PDF
MUFON from April and May 2009 have reached a plateau at $23,803.95 and $23,812.00
respectively.
For these reasons, we propose a Phase II funding level between July 1 and October 31, 2009
of $25,500 per month. This sum, when added to the unspent MU FON allocations
(estimated at approximately $120,000 for February/March, April and May 2009} should be
more than sufficient to almost double MUFON's present horsepower.
Regardless of the above, we believe that the accumulation of large sums of unspent money
was not in the spirit of the BAASS-MUFON purchase agreement.
It may be argued that MUFON has taken some time to ramp up to the present levels and
hence could not spend the allocated money. In response we propose that from July 1
October 31, if MU FON combines the monthly stipend ($25,500) with a monthly portion of
the unspent BAASS money, then a net monthly sum of approximately $55,000 is available
for MUFON's operations. We believe that this mechanism will be adequate for MUFON to
expand to a higher level of performance between July 1 and October 31, 2009.
By October 27, 2009, we will have another opportunity to examine the monthly contract
award In light of MUFON's progress in expanding its organizational productivity.
Sincerely
AAP Person 4
Administrator, BAASS
11843(a)(2)View the document record ↗ · Physical page 16, counting the cover.
EXCERPT 9 · PHYSICAL PAGE 2
Physical page 2, full page
June
2009 Report
Bigelow Aerospace Advanced
Space Studies
(BAASS)
Tl1is infor 111atio11 is propr ieta1ya11d co11fide11tial and ca, 11 ,ot be disse111i11ated
or used without prior writtefl eoAseAt from the Operatiflg MaAager of BAASS•.Editorial note: Title page of the June 2009 report, with the confidentiality notice crossed out.
Check the original PDF
June
2009 Report
Bigelow Aerospace Advanced
Space Studies
(BAASS)
Tl1is infor 111atio11 is propr ieta1ya11d co11fide11tial and ca, 11 ,ot be disse111i11ated
or used without prior writtefl eoAseAt from the Operatiflg MaAager of BAASS•.View the document record ↗ · Physical page 2, counting the cover.
EXCERPT 10 · PHYSICAL PAGE 3
Physical page 3, full page
PREFACE
This Progress report summarizes BAASS activities and progress for the
period June 1-June 30, 2009.
TABLE OF CONTENTS
Topics covered in this report are the following:
Progress on Recruiting Staff ................................................................................. Page 3
Progress on New BAASS Facilities........................................................................ Page 6
Progress on EarthTech Contract to Deliver 24-30 papers ................................ Page 8
Summary of MUFON Investigative Activity for June 2009 ...............................Page 11
BAASS Deployment to Brazil................................................................................Page 97
Project Northern Tier Update...........................................................................Page 116
BAASS Continues Study of the Information on UAP Activity Released
by the British, Canadian, French and Danish Governments ...........................Page 129
Conclusion ............................................................................................................. Page 131
2Editorial note: Preface and table of contents of the report: period from 1º to 30 June 2009 and list of the topics covered.
Check the original PDF
PREFACE
This Progress report summarizes BAASS activities and progress for the
period June 1-June 30, 2009.
TABLE OF CONTENTS
Topics covered in this report are the following:
Progress on Recruiting Staff ................................................................................. Page 3
Progress on New BAASS Facilities........................................................................ Page 6
Progress on EarthTech Contract to Deliver 24-30 papers ................................ Page 8
Summary of MUFON Investigative Activity for June 2009 ...............................Page 11
BAASS Deployment to Brazil................................................................................Page 97
Project Northern Tier Update...........................................................................Page 116
BAASS Continues Study of the Information on UAP Activity Released
by the British, Canadian, French and Danish Governments ...........................Page 129
Conclusion ............................................................................................................. Page 131
2View the document record ↗ · Physical page 3, counting the cover.
EXCERPT 11 · PHYSICAL PAGE 4
Physical page 4, full page
Progress on Staff Recruitment
•
Between June 1-30, 2009 in response to job advertisements in multiple on
line locations, BAASS received a total of 461 resumes.
•
The first level of screening (removal of applications on the basis of too
frequent job changes, those obviously inexperienced to work at BAASS,
non-US citizens etc) was conducted on all resumes.
•
Between three and four dozen phone and face-to-face interviews were
conducted during the month ofJune.
• As a result of intensive interviewing and the transfer of some engineers
from Bigelow Aerospace to BAASS, as of June 30, 2009 BAASS has forty five
full time employees and six part time employees in addition to the
administrator (see table on page 3 below). Fulltime BAASS employees now
include senior investigative personnel (backgrounds in law enforcement
and AFOSI), engineers (specializing in electrical, software and astronautics),
scientists (with expertise in physics and biology) as well as support
personnel and security guards.
3Editorial note: Summary of BAASS staff recruitment in June 2009: résumés received, screening, interviews and staff roster.
Check the original PDF
Progress on Staff Recruitment
•
Between June 1-30, 2009 in response to job advertisements in multiple on
line locations, BAASS received a total of 461 resumes.
•
The first level of screening (removal of applications on the basis of too
frequent job changes, those obviously inexperienced to work at BAASS,
non-US citizens etc) was conducted on all resumes.
•
Between three and four dozen phone and face-to-face interviews were
conducted during the month ofJune.
• As a result of intensive interviewing and the transfer of some engineers
from Bigelow Aerospace to BAASS, as of June 30, 2009 BAASS has forty five
full time employees and six part time employees in addition to the
administrator (see table on page 3 below). Fulltime BAASS employees now
include senior investigative personnel (backgrounds in law enforcement
and AFOSI), engineers (specializing in electrical, software and astronautics),
scientists (with expertise in physics and biology) as well as support
personnel and security guards.
3View the document record ↗ · Physical page 4, counting the cover.
EXCERPT 12 · PHYSICAL PAGE 5
Physical page 5, full page
BAASS Employees
AAP Person 4
Administrator
AAP Person 7
Deputy Administrator
Significant Part-time
Fulltime BAASS Employees
BAASS Employees
AAP Person 8
Senior Analyst level V
i:..AP Person 52
Senior Engineer level Ill
AAP Person 9
Lead Program Manager
AAP Person 53
Executive Assistant RTB
AAP Person 10
Lead Program Manager
AAP Person 54
Corporate Attorney
AAP Person 11
Senior Project Manager
AAP Person 55
Accountant
AAP Person 12
Senior Project Manager
AAP Person 56
Subject Matter Expert IV
AAP Person 13
Senior Project Manager
AAP Person 14
Mission Analyst
AAP Person 15
Mission Analyst
AAP Person 16
Mission Analyst
AAP Person 17
Mission Analyst
AAP Person 18
Lead Scientist level V
AAP Person 19
Lead Scientist level V
AAP Person 20
Engineer Specialist
AAP Person 21
Lead Engineer
AAP Person 22
Engineer Specialist
AAP Person 23
Lead Engineer
AAP Person 24
Lead Scientist level IV
AAP Person 25
Subject Matter Expert I
AAP Person 26
Subject Matter Expert I
AAP Person 27
Subject Matter Expert I
AAP Person 29
Subject Matter Expert I
AAP Person 30
Mission Analyst
AAP Person 31
Mission Analyst
AAP Person 32
Mission Analyst
AAP Person 33
Subject Matter Expert I
AAP Person 34
Mission Analyst
AAP Person 35
Mission Analyst
AAP Person 36
Mission Analyst
AAP Person 110
Mission Analyst
AAP Person 38
Mission Analyst
AAP Person 39
Mission Analyst
AAP Person 40
Mission Analyst
AAP Person 41
Mission Analyst
4Editorial note: Table of the BAASS staff roster in June 2009, with employees identified by clearance codes (AAP Person) and their positions.
Check the original PDF
BAASS Employees
AAP Person 4
Administrator
AAP Person 7
Deputy Administrator
Significant Part-time
Fulltime BAASS Employees
BAASS Employees
AAP Person 8
Senior Analyst level V
i:..AP Person 52
Senior Engineer level Ill
AAP Person 9
Lead Program Manager
AAP Person 53
Executive Assistant RTB
AAP Person 10
Lead Program Manager
AAP Person 54
Corporate Attorney
AAP Person 11
Senior Project Manager
AAP Person 55
Accountant
AAP Person 12
Senior Project Manager
AAP Person 56
Subject Matter Expert IV
AAP Person 13
Senior Project Manager
AAP Person 14
Mission Analyst
AAP Person 15
Mission Analyst
AAP Person 16
Mission Analyst
AAP Person 17
Mission Analyst
AAP Person 18
Lead Scientist level V
AAP Person 19
Lead Scientist level V
AAP Person 20
Engineer Specialist
AAP Person 21
Lead Engineer
AAP Person 22
Engineer Specialist
AAP Person 23
Lead Engineer
AAP Person 24
Lead Scientist level IV
AAP Person 25
Subject Matter Expert I
AAP Person 26
Subject Matter Expert I
AAP Person 27
Subject Matter Expert I
AAP Person 29
Subject Matter Expert I
AAP Person 30
Mission Analyst
AAP Person 31
Mission Analyst
AAP Person 32
Mission Analyst
AAP Person 33
Subject Matter Expert I
AAP Person 34
Mission Analyst
AAP Person 35
Mission Analyst
AAP Person 36
Mission Analyst
AAP Person 110
Mission Analyst
AAP Person 38
Mission Analyst
AAP Person 39
Mission Analyst
AAP Person 40
Mission Analyst
AAP Person 41
Mission Analyst
4View the document record ↗ · Physical page 5, counting the cover.
EXCERPT 13 · PHYSICAL PAGE 6
Physical page 6, full page
AAP Person 42
Executive Secretary
AAP Person 43
Receptionist
AAP Person 44
Director of security
IAAP Person 45
Security Officer
AAP Person 46
Security Officer
AAP Person 47
Security Officer
AAP Person 48
!Security Officer
AAP Person 49
Security Officer
AAP Person 50
Security Officer
AAP Person 51
Security Officer
Utah Ranch
Security Officers
We are optimistic that in the next month we can hire the first year's full
complement of staff (approximately 50-60 personnel to begin the 2nd year) that
will make BAAS$ the most maximally productive organization in this field.
However, this will give BAAS$ a foundational base that will partially cover the
investigative and analytical needs within the United States.
sEditorial note: End of the BAASS staff table (secretarial, reception and security, including guards at the ranch in Utah) and hiring target for the second year.
Check the original PDF
AAP Person 42
Executive Secretary
AAP Person 43
Receptionist
AAP Person 44
Director of security
IAAP Person 45
Security Officer
AAP Person 46
Security Officer
AAP Person 47
Security Officer
AAP Person 48
!Security Officer
AAP Person 49
Security Officer
AAP Person 50
Security Officer
AAP Person 51
Security Officer
Utah Ranch
Security Officers
We are optimistic that in the next month we can hire the first year's full
complement of staff (approximately 50-60 personnel to begin the 2nd year) that
will make BAAS$ the most maximally productive organization in this field.
However, this will give BAAS$ a foundational base that will partially cover the
investigative and analytical needs within the United States.
sView the document record ↗ · Physical page 6, counting the cover.
EXCERPT 14 · PHYSICAL PAGE 62
Physical page 62, full page
NOT COMPLETE
Summary
•
Dispatcher notes 5-26-09 - ***** ***** called back,
•
Witness: doesn't know why he woke up except he felt immediate fear and
compelled to go outside.
• The light was up high, large as a baseball with colored bars on all four sides
(light blue on each side, red on top, blue on bottom), they did not change size
or shape, object in the middle did change shape continually. Smaller objects
kept going in and out of it constantly. The object was baseball size and
seemed to emit some kind of energy, "like looking through a prism".
• jets all over sky, stayed in sky for over 3 hours, Object moving 3 to 4 times
faster than the other jets,
•
lost connection to internet during the observation,
•
Object was so bright (example when you look at the sun you see spots) same
thing, Witness had red patches on his arm, his chest is red and patchy, the
top of his head is very red, look like red skin, not a burn,
• seemed to witness like it was only 15 - 20 minutes that he was watching this
but as he thinks back at it now he first saw it about 3 am and finished at 6 am
it took 3 hours but didn't seem like it missing sometime
•
2nd Witness was involved
•
He did feel some dizziness, heart rate increased exactly like he had too much
caffeine, at other times he was calm, other times afraid.
•
He is not adverse to an investigator going to speak to him. Dispatcher: ;; )43(a)
59Editorial note: Incomplete summary of case 17163, in Bowling Green, Kentucky: notes by the MUFON call taker of 26 May 2009 about a colored light observed in the early morning hours for about three hours.
Check the original PDF
NOT COMPLETE
Summary
•
Dispatcher notes 5-26-09 - ***** ***** called back,
•
Witness: doesn't know why he woke up except he felt immediate fear and
compelled to go outside.
• The light was up high, large as a baseball with colored bars on all four sides
(light blue on each side, red on top, blue on bottom), they did not change size
or shape, object in the middle did change shape continually. Smaller objects
kept going in and out of it constantly. The object was baseball size and
seemed to emit some kind of energy, "like looking through a prism".
• jets all over sky, stayed in sky for over 3 hours, Object moving 3 to 4 times
faster than the other jets,
•
lost connection to internet during the observation,
•
Object was so bright (example when you look at the sun you see spots) same
thing, [omitido]
[omitido]
• seemed to witness like it was only 15 - 20 minutes that he was watching this
but as he thinks back at it now he first saw it about 3 am and finished at 6 am
it took 3 hours but didn't seem like it missing sometime
•
2nd Witness was involved
•
[omitido]
[omitido]
•
He is not adverse to an investigator going to speak to him. Dispatcher: ;; )43(a)
59View the document record ↗ · Physical page 62, counting the cover.
EXCERPT 15 · PHYSICAL PAGE 7
Physical page 7, full page
Progress on New BAASS Facilities
During the month of Jun~AAP Person 4
jthe BAASS administrator,
made substantial progress on two major real estate projects in line with
anticipated future BAASS needs.
(1) Underground Vault: The need for a highly secure underground vault
operated by BAASS became apparent in line with a BAASS priority to
pursue and acquire recovered hardware and biological samples from the
corporate world and/or from private individuals and groups located
elsewhere, including in Brazil. It was recognized by the BAASS
administrator that there was no highly secure facility at BAASS to store
exotic material or tissue that the organization could obtain. Accordingly,
the BAASS administrator designed an underground facility to be located
in North Las Vegas at the Bigelow Aerospace facility. The chosen
location is exceptionally well protected by perimeter fencing and razor
wire, surveillance cameras and 24 hour armed guards who are retired or
current military. Further, the BAASS administrator during the month of
June designed and created architectural plans for a 5000 sq.ft
underground vault with 3 foot thick walls, ceiling and floor with a
concrete access tunnel leading to multiple security doors, at least one of
which comprises a thick vault steel door. The entire facility will be
located underground at the Bigelow Aerospace facility with over 15-20
feet of earth above the structure. Any surface structures protruding
from the ground will be extensively camouflaged. It is anticipated that
subject to building permits, the new underground facility will be capable
of being occupied by late 2009 or early 2010. More details on this
project will be reported in the June 2009 BAASS monthly report.
(2) New Buildings Purchased for BAASS: Because of the extremely rapid
pace of BAASS personnel expansion (see previous section), the
6Editorial note: BAASS plans for an underground vault in North Las Vegas, intended to store materials and biological samples the organization might obtain.
Check the original PDF
Progress on New BAASS Facilities
During the month of Jun~AAP Person 4
jthe BAASS administrator,
made substantial progress on two major real estate projects in line with
anticipated future BAASS needs.
(1) Underground Vault: The need for a highly secure underground vault
operated by BAASS became apparent in line with a BAASS priority to
pursue and acquire recovered hardware and biological samples from the
corporate world and/or from private individuals and groups located
elsewhere, including in Brazil. It was recognized by the BAASS
administrator that there was no highly secure facility at BAASS to store
exotic material or tissue that the organization could obtain. Accordingly,
the BAASS administrator designed an underground facility to be located
in North Las Vegas at the Bigelow Aerospace facility. The chosen
location is exceptionally well protected by perimeter fencing and razor
wire, surveillance cameras and 24 hour armed guards who are retired or
current military. Further, the BAASS administrator during the month of
June designed and created architectural plans for a 5000 sq.ft
underground vault with 3 foot thick walls, ceiling and floor with a
concrete access tunnel leading to multiple security doors, at least one of
which comprises a thick vault steel door. The entire facility will be
located underground at the Bigelow Aerospace facility with over 15-20
feet of earth above the structure. Any surface structures protruding
from the ground will be extensively camouflaged. It is anticipated that
subject to building permits, the new underground facility will be capable
of being occupied by late 2009 or early 2010. More details on this
project will be reported in the June 2009 BAASS monthly report.
(2) New Buildings Purchased for BAASS: Because of the extremely rapid
pace of BAASS personnel expansion (see previous section), the
6View the document record ↗ · Physical page 7, counting the cover.
EXCERPT 16 · PHYSICAL PAGE 8
Physical page 8, full page
organization is close to outgrowing the current BAASS facility.
Accordingly, the BAASS administrator began planning for this eventuality
late last year (2008) and in the past several months has personally
visited and inspected close to fifty separate buildings for sale located in
different areas of the Las Vegas Valley with a view to purchasing a new
facility for the rapidly expanding organization. This lengthy, time
consuming process culminated in the purchase of five new office
buildings which will be customized for BAASS personnel use. As of June
31, 2009 these five buildings are now in escrow. It is intended that the
buildings will include a 5000 sq ft laboratory and secure physical
evidence storage facility and a second building will contain a secure
conference room (SCIF) and adjacent office space for multiple
personnel. These new buildings should be capable o'f being occupied by
BAASS personnel by the end of 2009.
7Editorial note: Purchase of five office buildings in the Las Vegas Valley for BAASS, with a laboratory, a physical evidence storage facility and a secure room (SCIF).
Check the original PDF
organization is close to outgrowing the current BAASS facility.
Accordingly, the BAASS administrator began planning for this eventuality
late last year (2008) and in the past several months has personally
visited and inspected close to fifty separate buildings for sale located in
different areas of the Las Vegas Valley with a view to purchasing a new
facility for the rapidly expanding organization. This lengthy, time
consuming process culminated in the purchase of five new office
buildings which will be customized for BAASS personnel use. As of June
31, 2009 these five buildings are now in escrow. It is intended that the
buildings will include a 5000 sq ft laboratory and secure physical
evidence storage facility and a second building will contain a secure
conference room (SCIF) and adjacent office space for multiple
personnel. These new buildings should be capable o'f being occupied by
BAASS personnel by the end of 2009.
7View the document record ↗ · Physical page 8, counting the cover.
EXCERPT 17 · PHYSICAL PAGE 9
Physical page 9, full page
Progress by Earthtech on Production
of 24-30 Position Papers on Physics of
Advanced Aerospace Vehicles
On December 31, 2008 BAASS awarded a contract to Earthtech
lnternationallAAPPerson 57
Ito deliver 24-30 position papers that will be based
on expanding and focusing on strategically important sub-projects from the 12
position papers previously delivered by the subcontractor on twelve (12) technical
areas: 1.) Lift,
2.) Propulsion, 3.) Control, 4.) Power Generation, 5.)
Spatial/Temporal Translation, 6.) Materials, 7.) Configuration/Structure, 8.)
Signature Reduction (optical, infrared, radiofrequency, acoustic), 9.) Human
Interface, 10.) Human Effects, 11.) Armament (RF and DEW), 12.) Other peripheral
areas in support of (1-11).
d•
t
d t
f
IAAP Person 57
I
• b •
d
Accor mg o an up a e rom............._ ..........................._. progress Is
emg ma e.
Delivery of all 24-30 papers is scheduled for July 2009. Several drafts and even
final papers have been already received by
and are in various stages of AAPP_erson
57
being scrutinized. The following is an update from.___ _ __,....___, on the individual
contributors and the titles of their reports as of the end o June 2009. As of the ~ PPerson
end of June 2009, Earthtech have taken delivery of approximately 24 papers.
8Editorial note: Progress of the EarthTech International contract to produce 24 to 30 studies on the physics of advanced aerospace vehicles (the future DIRDs).
Check the original PDF
Progress by Earthtech on Production
of 24-30 Position Papers on Physics of
Advanced Aerospace Vehicles
On December 31, 2008 BAASS awarded a contract to Earthtech
lnternationallAAPPerson 57
Ito deliver 24-30 position papers that will be based
on expanding and focusing on strategically important sub-projects from the 12
position papers previously delivered by the subcontractor on twelve (12) technical
areas: 1.) Lift,
2.) Propulsion, 3.) Control, 4.) Power Generation, 5.)
Spatial/Temporal Translation, 6.) Materials, 7.) Configuration/Structure, 8.)
Signature Reduction (optical, infrared, radiofrequency, acoustic), 9.) Human
Interface, 10.) Human Effects, 11.) Armament (RF and DEW), 12.) Other peripheral
areas in support of (1-11).
d•
t
d t
f
IAAP Person 57
I
• b •
d
Accor mg o an up a e rom............._ ..........................._. progress Is
emg ma e.
Delivery of all 24-30 papers is scheduled for July 2009. Several drafts and even
final papers have been already received by
and are in various stages of AAPP_erson
57
being scrutinized. The following is an update from.___ _ __,....___, on the individual
contributors and the titles of their reports as of the end o June 2009. As of the ~ PPerson
end of June 2009, Earthtech have taken delivery of approximately 24 papers.
8View the document record ↗ · Physical page 9, counting the cover.
EXCERPT 18 · PHYSICAL PAGE 132
Physical page 132, full page
BAASS Continues Study on Information on
UAPs released by the British, Canadian, French
and Danish Governments
•
Over the past eighteen months, The Ministry of Defense (MoD) in the
United Kingdom has released approximately 7297 pages of files pertaining
to the performance of alleged UAPs in British air space. More recently the
British MoD released a second group of files on March 21, 2009 comprising
1200 separate UFO cases in approximately 2000 additional pages. BAASS
analysts have initiated the process of downloading, organizing and
analyzing these files to determine the quality and quantity of reports that
have been released by the UK government, particularly those reports that
might pertain to events with national security implications.
•
In February 2009, the Canadian government authorized the release of 9500
pages of files pertaining to the behavior of alleged advanced aerospace
vehicles in Canadian air space. The files cover the period 1947-1980. Many
of the cases were investigated by the Royal Canadian Mounted Police.
BAASS analysts have initiated the process of downloading, printing,
organizing and analyzing these files. The aim is to delineate the extent of
high quality evidence pertaining to the topic of advanced aerial vehicle
performance in the 9500 pages of Canadian files.
•
On January 29, 2009 the Danish Air Force released 329 pages of reports on
unusual aerial phenomena. All reports are in Danish; therefore BAASS
contracted a Danish-English translator to produce English translations of all
329 pages of released files. The translation will be complete by March 13,
2009. Once the files are translated, BAASS analysts will examine them to
delineate whether there are any cases that merit further study.
129Editorial note: Section of the report on BAASS's study of the UAP files released by the United Kingdom, Canada and Denmark.
Check the original PDF
BAASS Continues Study on Information on
UAPs released by the British, Canadian, French
and Danish Governments
•
Over the past eighteen months, The Ministry of Defense (MoD) in the
United Kingdom has released approximately 7297 pages of files pertaining
to the performance of alleged UAPs in British air space. More recently the
British MoD released a second group of files on March 21, 2009 comprising
1200 separate UFO cases in approximately 2000 additional pages. BAASS
analysts have initiated the process of downloading, organizing and
analyzing these files to determine the quality and quantity of reports that
have been released by the UK government, particularly those reports that
might pertain to events with national security implications.
•
In February 2009, the Canadian government authorized the release of 9500
pages of files pertaining to the behavior of alleged advanced aerospace
vehicles in Canadian air space. The files cover the period 1947-1980. Many
of the cases were investigated by the Royal Canadian Mounted Police.
BAASS analysts have initiated the process of downloading, printing,
organizing and analyzing these files. The aim is to delineate the extent of
high quality evidence pertaining to the topic of advanced aerial vehicle
performance in the 9500 pages of Canadian files.
•
On January 29, 2009 the Danish Air Force released 329 pages of reports on
unusual aerial phenomena. All reports are in Danish; therefore BAASS
contracted a Danish-English translator to produce English translations of all
329 pages of released files. The translation will be complete by March 13,
2009. Once the files are translated, BAASS analysts will examine them to
delineate whether there are any cases that merit further study.
129View the document record ↗ · Physical page 132, counting the cover.
EXCERPT 19 · PHYSICAL PAGE 133
Physical page 133, full page
• Throughout 2005-2008, GEIPAN, a department of CNES (French civilian
space agency), released about 100,000 pages comprising the investigative
reports from approximately 1650 cases, including 6000 eyewitness
interviews involving UAPs, the majority of which have been investigated by
the Gendarmerie. BAASS translators/analysts are currently sorting and
codifying the cases so that only the highest value cases for BAASS will be
translated and entered into the BAASS database.
130Editorial note: Continuation of the section on foreign files: the French GEIPAN reports being screened by BAASS.
Check the original PDF
• Throughout 2005-2008, GEIPAN, a department of CNES (French civilian
space agency), released about 100,000 pages comprising the investigative
reports from approximately 1650 cases, including 6000 eyewitness
interviews involving UAPs, the majority of which have been investigated by
the Gendarmerie. BAASS translators/analysts are currently sorting and
codifying the cases so that only the highest value cases for BAASS will be
translated and entered into the BAASS database.
130View the document record ↗ · Physical page 133, counting the cover.
EXCERPT 20 · PHYSICAL PAGE 134
Physical page 134, full page
Conclusion
Significant progress has been made in training and initially deploying BAASS
field investigative teams during the month of June. Further, especially following
the recent deployment of BAASS personnel to Northern and Southern Brazil,
BAASS has begun to acquire significant information on UAP activity in Brazil.
Recently, BAASS has initiated contact with Air Force personnel in Uruguay
(CRIDOVNI). The BAASS MUFON relationship is being closely monitored especially
since the case numbers that MUFON are alerting BAASS with are still considerably
lower than originally expected. However, in BAASS's estimation, MU FON are
entering the next several months with a much clearer sense of purpose regarding
executing the deliverables of the contract with BAASS. The BAASS database of
cases is now larger than any other database owned by UAP organizations in North
America.
Secondly BAASS is currently accelerating the acquisition of all information
pertaining to advanced aerospace technology topic in the open literature,
increasingly from other countries.
131Editorial note: Conclusion of the June 2009 monthly report: field teams, the mission to Brazil, the contact with the Uruguayan CRIDOVNI and the relationship with MUFON.
Check the original PDF
Conclusion
Significant progress has been made in training and initially deploying BAASS
field investigative teams during the month of June. Further, especially following
the recent deployment of BAASS personnel to Northern and Southern Brazil,
BAASS has begun to acquire significant information on UAP activity in Brazil.
Recently, BAASS has initiated contact with Air Force personnel in Uruguay
(CRIDOVNI). The BAASS MUFON relationship is being closely monitored especially
since the case numbers that MUFON are alerting BAASS with are still considerably
lower than originally expected. However, in BAASS's estimation, MU FON are
entering the next several months with a much clearer sense of purpose regarding
executing the deliverables of the contract with BAASS. The BAASS database of
cases is now larger than any other database owned by UAP organizations in North
America.
Secondly BAASS is currently accelerating the acquisition of all information
pertaining to advanced aerospace technology topic in the open literature,
increasingly from other countries.
131View the document record ↗ · Physical page 134, counting the cover.
Dates and documentary context
- Event
- 30/06/2009 — Period covered: 1º to 30 June 2009 (p. 3).
- Document
- 09/07/2009 — Cover date (p. 1).
- Publication
- Not established — Release 07 from war.gov (DOW-UAP series, document D171); individual release date not indicated on the pages.
Origin and release
Bigelow Aerospace Advanced Space Studies (BAASS), contractor of the Defense Intelligence Agency (DIA); Mutual UFO Network (MUFON) field reports included · DOW-UAP-D171-BAASS_Monthly_Report_June_2009.pdf
Pages 68 to 134 read for the summary.
Related accounts and their differences
- DIA's contracting of BAASS, 2008
- Scammon, Kansas, 2009
- Dardanelle, Arkansas, 2009
- Marathon, Texas, 2009
- Buffalo, Oklahoma, 2009
- Trego, Wisconsin, 2009
- Fallon, Nevada, 2009
- Pasadena, Maryland, 2009
- DIRDs on space warp and wormholes
Questions to continue the investigation
- Was the underground vault designed in North Las Vegas to store material and tissue obtained by BAASS ever built?
- Did MUFON file the access-to-information requests announced in the Dardanelle and Fallon cases, and was there a response?
- What results came from the analyses of the soil, grass and horsehair samples collected by MUFON and promised to BAASS?
GEOGRAPHY OF THE CASE
Las Vegas, Nevada, USA
Approximate reference to BAASS headquarters in Las Vegas, placed by the editorial team. It does not indicate the company's address.
DOCUMENTARY TRAIL
Go back to the sources
References use physical pages of the PDF, counting the cover. Summaries are presented in English; the documents keep their original language.
- DOW-UAP-D171-BAASS_Monthly_Report_June_2009.pdf
Physical pages 1 to 134: BAASS monthly report for June 2009, dated 09/07/2009 (pp. 1-16: staff, facilities, EarthTech and contract with MUFON; pp. 17-100: cases investigated by MUFON; pp. 101-118: mission to Brazil; pp. 119-131: Project Northern Tier; pp. 132-134: foreign files and conclusion)
DOW · 134 pages
Editorial summary based on the collection's research notes. How we read the documents.