Date: 02/01/2009 (document); senator's visit scheduled for 05/01/2009Location: Not stated in the document; visit by Senator Reid to the director of the Defense Intelligence Agency (DIA)

DIA, 2009: the agency prepares its director to tell Senator Reid that the AAWSAP contract with BAASS is on schedule and on budget

In January 2009, the Defense Intelligence Agency prepared a talking points sheet so that its director could brief Senator Harry Reid on the contract for the AAWSAP program, signed with the company BAASS. The text summarizes the program's origin in Congress, the contracting and the progress of the work, without addressing any UFO case.

AAWSAP and advanced technologies
Event date
02/01/2009 (document); senator's visit scheduled for 05/01/2009
Location
Not stated in the document; visit by Senator Reid to the director of the Defense Intelligence Agency (DIA)
Topic
AAWSAP and advanced technologies
Source agencies
DOW
Documents
1 document · 1 page
Reading time
5 min
Typewritten sheet with an unclassified marking, the acronym FOUO crossed out and numbered itemsFacsimile of the documentPhysical page 1
Facsimile of the document · Defense Intelligence Agency (DIA), Defense Warning Office · Physical page 1 of the released file. Single page of talking-points sheet U-326-09/DWO, with the objective, the history of the AAWSAP contract and the three status items prepared for the DIA director before Senator Reid's visit. Physical page 1. It shows how the DIA summarized the administrative status of the contract; it contains no data on UFOs and does not prove what was said during the visit. Documentary source ↗ · Enlarge image ↗

DOCUMENTARY SOURCES · DOW

What the records tell

Date: January 2, 2009. Document U-326-09/DWO is a one-page talking points sheet, prepared by the Acquisition Support Division (DWO-3) of the Defense Warning Office, of the Defense Intelligence Agency (DIA). The stated purpose was to inform Lieutenant General Maples, the agency's director, about the status of the Advanced Aerospace Weapon System Applications contract, known by the acronym AAWSAP, in case Senator Reid, of Nevada, raised the subject during the visit scheduled for January 5, 2009.

According to the document's background, Senators Inouye, of Hawaii, and Reid sponsored a provision in the July 2008 supplemental appropriations bill. The provision directed the DIA to investigate foreign advanced aerospace weapon threats, from the present to 40 years in the future. The sheet records that Senator Reid had a "deep interest" in unconventional aerospace technologies, defined in the text as those representing a radical departure from those used in the advanced aerospace vehicles of the time.

The document also summarizes the contracting. The Acquisition Support Division issued a request for proposals on August 18, 2008. The DIA received a single proposal, from Bigelow Aerospace Advanced Space Studies (BAASS). Two sections of the agency, identified as DIA/AE and DIA/DWO, concluded that the proposal met the requirements, and the contract was signed on September 22, 2008. The text also cites an earlier meeting between the director and the senator, on November 13, 2008.

Since that meeting, according to the sheet, BAASS delivered on November 21, 2008 the 12 management plans for the technical areas. DWO-3 rated them "very good to excellent" and authorized the company to proceed to the technical reports, about two per area, with a delivery target of the end of July 2009. The Defense Security Service inspected the BAASS facilities on December 17, 2008, with a satisfactory result, and the security clearance was expected soon.

DWO-3's conclusion is that the contract was on schedule and on budget, with the technical reports subcontracted through February 2009. The document does not mention sightings, UFO cases or investigation sites. It shows that DIA leadership expected questions from a senator about the program and was preparing to answer them. It does not state whether the visit took place, nor what was said during it. The assessments of the quality of the plans are by the same division that administered the contract. The name of the person who prepared the sheet is redacted.

DIRECT READING OF THE FILE

The document, in the original

The single page of document U-326-09/DWO is translated in full in the page block, including the classification markings and the redaction indications.

EXCERPT 1 · PHYSICAL PAGE 1

Physical page 1, full page

UNCLASSIFIED,'1F O"O U-326-09/DWO 02 January 2009 Talking Paper for the Director SUBJECT: (U) Senator Reid Visit to Director, DIA, 05 January 2009 1. (U) PURPOSE: To provide LTG Maples with the current status of the Advanced Aerospace Weapon System Applications contract should Senator Reid raise the topic. 2. (U/;lf@WO) BACKGROUND: Senator Inouye (D-HI) and Senator Reid (D-Nev) sponsored language in the July 2008 Supplemental Appropriation bill for DIA to investigate foreign advanced aerospace weapon threats from the present out to 40 years in the future. Senator Reid has a deep interest in the potential threat posed by unconventional aerospace technologies; that is, technologies that are a radical departure to those used in current advanced aerospace vehicles. In response to this tasking, the Acquisition Support Division (DW0-3) published a request for proposals (RFP) on 18 August 2008. DIA received only one bid, from Bigelow Aerospace Advanced Space Studies (BAASS), in response to the RFP. DIA/ AE and DIA/DWO determined that the proposal was responsive and the contract signed on 22 September 2008. Since the Director's meeting with Senator Reid on 13 November 2008, the following items have been completed per the contract. 3. (U) TALKING POINTS: • (U.'/FOWO) Program Management Plans. BAASS submitted the 12 technical area program management plans (PMPs) on 21 November 2008. o (U.'/FOWO) DW0-3 reviewed the PMPs and rated them as very good to excellent. DW0-3 granted BAASS approval to proceed with the technical reports. o (U.':'Ji0W8' BAASS will deliver to DIA approximately two detailed reports per technical area. The goal is for DWO to have all reports by the end of July 2009. • (U/,'F@EO) Facility Clearance. The Defense Security Service conducted a site inspection on the BAASS facility on 17 December 2008. The inspection was completed satisfactorily and the facility clearance process is expected to be completed shortly. • (U':'FOFO) Contract is on track. The contract is currently proceeding on schedule and within cost. The technical reports will be under subcontract by February 2009 and completed by the end of July 2009. 1843(a)(2 ) U Pre ared b Defense Warning Office, Acquisition Support Division (DW0-3), r.:-18;:;-<:4Ù3(Úa':'t. )(2:;;)---,___----'

Editorial note: Physical page 1 of DOW-UAP-D187-DIA_Talking_Paper_for_Senator_Reid_Engagement_January-2009.pdf.

Check the original PDF
UNCLASSIFIED,'1F O"O U-326-09/DWO 02 January 2009 Talking Paper for the Director SUBJECT: (U) Senator Reid Visit to Director, DIA, 05 January 2009 1. (U) PURPOSE: To provide LTG Maples with the current status of the Advanced Aerospace Weapon System Applications contract should Senator Reid raise the topic. 2. (U/;lf@WO) BACKGROUND: Senator Inouye (D-HI) and Senator Reid (D-Nev) sponsored language in the July 2008 Supplemental Appropriation bill for DIA to investigate foreign advanced aerospace weapon threats from the present out to 40 years in the future. Senator Reid has a deep interest in the potential threat posed by unconventional aerospace technologies; that is, technologies that are a radical departure to those used in current advanced aerospace vehicles. In response to this tasking, the Acquisition Support Division (DW0-3) published a request for proposals (RFP) on 18 August 2008. DIA received only one bid, from Bigelow Aerospace Advanced Space Studies (BAASS), in response to the RFP. DIA/ AE and DIA/DWO determined that the proposal was responsive and the contract signed on 22 September 2008. Since the Director's meeting with Senator Reid on 13 November 2008, the following items have been completed per the contract. 3. (U) TALKING POINTS: • (U.'/FOWO) Program Management Plans. BAASS submitted the 12 technical area program management plans (PMPs) on 21 November 2008. o (U.'/FOWO) DW0-3 reviewed the PMPs and rated them as very good to excellent. DW0-3 granted BAASS approval to proceed with the technical reports. o (U.':'Ji0W8' BAASS will deliver to DIA approximately two detailed reports per technical area. The goal is for DWO to have all reports by the end of July 2009. • (U/,'F@EO) Facility Clearance. The Defense Security Service conducted a site inspection on the BAASS facility on 17 December 2008. The inspection was completed satisfactorily and the facility clearance process is expected to be completed shortly. • (U':'FOFO) Contract is on track. The contract is currently proceeding on schedule and within cost. The technical reports will be under subcontract by February 2009 and completed by the end of July 2009. 1843(a)(2 ) U Pre ared b Defense Warning Office, Acquisition Support Division (DW0-3), r.:-18;:;-<:4Ù3(Úa':'t. )(2:;;)---,___----'

View the document record ↗ · Physical page 1, counting the cover.

Dates and documentary context

Event
05/01/2009 — Scheduled date for Senator Reid's visit to the DIA director; the document does not confirm that the visit took place.
Document
02/01/2009 — Date of document U-326-09/DWO.
Publication
Not established — Published by the U.S. Department of War on war.gov, release 08 of UAP files (2026).

Origin and release

Defense Intelligence Agency (DIA), Defense Warning Office, Acquisition Support Division (DWO-3); author's name redacted · DOW-UAP-D187-DIA_Talking_Paper_for_Senator_Reid_Engagement_January-2009.pdf

Physical page 1 (single-page document).

undefined ↗ — undefined

Related accounts and their differences

Questions to continue the investigation

  • Did the January 5, 2009 visit take place, and was the AAWSAP contract discussed during it?
  • What were the 12 technical areas whose management plans BAASS delivered in November 2008?
  • Were all the technical reports delivered by the end of July 2009, as the goal called for?

GEOGRAPHY OF THE CASE

Location not provided

The document does not say where the senator's visit to the DIA director would take place.

DOCUMENTARY TRAIL

Go back to the sources

References use physical pages of the PDF, counting the cover. Summaries are presented in English; the documents keep their original language.

  1. DOW-UAP-D187-DIA_Talking_Paper_for_Senator_Reid_Engagement_January-2009.pdf

    Physical page 1

    DOW · 1 page

Editorial summary based on the collection's research notes. How we read the documents.

ONE STORY LEADS TO ANOTHER

Keep exploring.

Back to the archive ↗
Blue and white cover of a DIA report with the agency seal, the date December 14, 2009 and the title about metallic glasses.Document cover

AAWSAP and advanced technologies2009Location: Report by the DIA's Acquisition Support Division (DWO-3), Washington, D.C., USA

Full dossier

DIA, 2009: AAWSA study on metallic glasses concludes that only dendrite composites are suitable for aerospace structures

The Defense Intelligence Reference Document of December 14, 2009 evaluates metallic glasses for aerospace use. It concludes that they are very strong but brittle and have poor fatigue performance, and that only composites with ductile dendrites and new lightweight alloys could make them useful, on a horizon of 20 to 50 years.

Open the case
Drawing of a cut cylindrical fiber, with concentric rings labeled Power & Control Signals, Memory, N-Layer and P-Layer and yellow pieces on the surface labeled ConductorsTechnical figure

AAWSAP and advanced technologies2009Location: Report prepared for the DIA Acquisition Support Division (DWO-3), Washington, D.C., USA

Full dossier

DIA, 2009: AAWSA study envisions materials that change properties on command, from smart windows to spacecraft hulls

The DIRD of December 14, 2009 presents programmable matter, that is, materials whose optical, electrical, and thermal properties change on command, as a technology for spacecraft over the next 50 years. It identifies smart windows as the nearest-term application and acknowledges that part of the scenario is speculative.

Open the case
Color cover with the BAASS logo, the title March Report and the date April 10, 2009Document cover

AAWSAP and advanced technologies2009Location: Bigelow Aerospace Advanced Space Studies, Las Vegas, Nevada, USA (place of writing not indicated on the page)

Las Vegas, March 2009: BAASS report counts 234 thousand reports in the Capella database, buys cases from MUFON and summarizes the Colares wave

The March 2009 progress report of BAASS, a DIA contractor in the AAWSAP program, reports hiring, security clearances, the technical papers commissioned through Earthtech, the statistics of the Capella database and a contract with MUFON. It also includes scenarios for a University of Nevada study and an executive summary on the Colares cases, in Pará.

Open the case

YOUR CHOICE

Cloudflare measures visits and performance without cookies, in aggregate statistics. Google Analytics only loads if you authorize it below. You can decline the optional items and browse the entire archive.

Read privacy policy